![]() MGB engine ready for paint |
![]() In etch prime |
![]() 2nd prime coat with initial paintt going on |
![]() Cylinder head reconditioning for lead-free operation |
![]() Checking crankshaft runout at center main journal |
![]() Checking crankshaft end float |
![]() More Power! .100”O/S JE pistons to our pattern |
![]() Running a Plasticgage check for bearing clearances. |
![]() Verifying TDC marks on timing cover & pulley |
![]() Setting cam timing at cam follower |
![]() Lower end: Check marks on caps indicate final torque |
![]() No white box parts in this engine |
![]() Engine ready for installation |
![]() Installed and ready for the road |
![]() Another SCS MGB at a 10,000 mile teardown |